Project: Conservation and restoration intervention of the Manueline Cloister of the Pena National Palace
Year: 2017/18
Location: Sintra
Background: Pena´s National Palace
Description: The following elements were intervened: the ceramic coverings of the façades and floor of the Cloister; the Chapel of S. Jerónimo (integrated in the Lower Gallery and characterized by the cladding with decorative technique of embeddings) and the railing of the roof of the Cloister.
Intervention:
The intervention aimed at suspending the current degradation mechanisms; delay future degradation; the correction of structural misalignments; replacing poor quality replicas. aesthetic correction of changes caused by degradation factors.
Duration: 12 months
Team: 6 people
Links: